-
Sage Green Embroidered Lehenga Set
โฌ613.16Sage Green raw silk lehenga set with sequin, pearl and cutdana hand embroidered butti and zari and pearl work border, paired with raw silk blouse hand embroidered with zardozi, sequin and pearl work and beige sequin net dupatta. This is a โMade to Orderโ ensemble. Estimated arrival time is 4โฆ
-
Nude Pink and Beige Lehenga Set
โฌ613.16Nude Pink geoegette Lehenga with sequin butti handwork allover paired with Beige raw silk blouse in intricate Mirror, Pearl and Zardozi hand embroidery. The look is complete with Beige tulle dupatta in big Gota and pearl handwork butti allover and sequin-pearl work border detailing. This is a โMade to Orderโโฆ
-
Multipanel Sharmily Lehenga Set
โฌ590.78Multipanel lehenga set in Gota, Thread and butti design in multi-hued pastel shade paired with Powder Pink raw silk blouse in Zardozi and sequin work and Lime Yellow organza dupatta. This is a โMade to Orderโ ensemble. Estimated arrival time is 4 to 6 weeks from the date of purchase.โฆ
-
Multipanel and Multicolour Lehenga Set
โฌ590.78Multipanel lehenga set in Gota, Thread and butti design in multi-hued pastel shades paired with Sequin and Beads work bustier and Mint Green dupatta. This is a โMade to Orderโ ensemble. Estimated arrival time is 4 to 6 weeks from the date of purchase. Want to customise this outfit, simplyโฆ
-
Olive Green and Powder Pink Lehenga Set
โฌ590.78Olive Green georgette Sharmily lehenga with sequin work buttis allover and zari-sequin work border detailing, Paired with Olive raw silk blouse intricately done in Mirror, pearl and zardozi hand embroidery. The look is complete with Powder Pink tulle dupatta in gota, sequin and pearl hand embroidery work buttis. This isโฆ
-
Fuchsia Pink Sharmily Work Lehenga Set
โฌ546.02Fuchsia butti georgette lehenga set with zari and sequin work border detailing, Paired with antique sequin and zardozi hand work raw silk blouse and shaded pink tulle dupatta with sequin work highlight. This is a โMade to Orderโ ensemble. Estimated arrival time is 4 to 6 weeks from the dateโฆ